The total investment of the project is 10,990 billion VND. Capital to implement the project is mobilized from ACV’s equity capital (70%) and commercial loans (30%).

The passenger terminal has a scale of 1 basement and 4 floors, with a total construction floor area of ​​112,500 m2.

The station has a linear shape similar to the existing station, designed into 2 separate departure and arrival elevations. The terminal has 90 traditional airline check-in counters, 20 automatic bagdrop counters and 42 check-in kiosks, 27 aircraft gates, 6 departure baggage handling islands and 10 arrival baggage return islands, 25 checkpoints. Passenger security control.

The total investment of the project is 10,990 billion VND. Capital to implement the project is mobilized from ACV’s equity capital (70%) and commercial loans (30%). The passenger terminal has a scale of 1 basement and 4 floors, with a total construction floor area of ​​112,500 m2. The station has a linear shape similar to […]