As a key project with a driving force for the socio-economic development of the province, component project 2 – Nhat Le 3 bridge and roads at both ends of the bridge have a total investment of 1,300 billion VND by Quang Binh Department of Planning and Investment. investor.

The project is designed to cross Nhat Le River, the starting point of the project intersects with National Highway 1A in Luong Ninh commune, Quang Ninh district and the ending point intersects with Vo Nguyen Giap street in Bao Ninh commune, City. . Dong Hoi.

The project has a total length of 2,826 km, of which the bridge length is 561.4 m. Nhat Le 3 Bridge is permanently built with steel and prestressed reinforced concrete, with an arch bridge structure. The road at both ends of the bridge is designed according to the urban main road level, with a design speed of 60 km/h, roadbed width from 23.5m to 54.5m, including 4 lanes. Project implementation period is from 2022 to 2026.

As a key project with a driving force for the socio-economic development of the province, component project 2 – Nhat Le 3 bridge and roads at both ends of the bridge have a total investment of 1,300 billion VND by Quang Binh Department of Planning and Investment. investor. The project is designed to cross Nhat […]